DeKalb Sanitary District- 2008 Interceptor Inspection and Cleaning Project
Project Description: The DeKalb Sanitary District is seekingbids for inspection and cleaning of 71,000 lineal feet of sanitary sewer ranging in size from 18-inch to 36-inch diameter pipe. Work shall consist of light cleaning, heavy cleaning and televising. |
| Project Manager: Mike Holland |
| Pre Bid Mtg - |
| Bid Date - Monday, March 17, 2008 - 11:30 A.M. |
| Advertisement - 630/ 587-0470 |
| Plan Holders List - 630/ 587-0470 |
| Bid Results - |
City of St. Charles - 2007 Sanitary Sewer Lining Project
Project Description: The City of St. Charles is seeking bids for cleaning, televising, and cured in place lining for 63 locationsthroughout the community.
|
| Project Manager: Mark Eddington, P.E. |
| Pre Bid Mtg - |
| Bid Date - Wednesday, September 26, 2007 - 11:00 A.M. |
| Advertisement - 630/ 587-0470 |
| Plan Holders List - 630/ 587-0470 |
| Bid Results - Insituform Technologies USA, Inc. - $512,654 |
Village of Addison - Church Street Rehabilitation & Watermain Replacement
Project Description: The Village of Addison is seeking bids for water main replacement and rehabilitation of Church Street in Addison, Illinois. The project includes:
- Pavement Patching, Edge Milling and Surface Overlay
- Existing Watermain Abandonment & New Watermain Construction
- Driveway Removal & Replacement
- Restoration of Disturbed Areas
|
| Project Manager: Mark Bushnell, P.E. |
| Pre Bid Mtg - |
| Bid Date - Friday, July 27, 2007 - 10:00 A.M. |
| Advertisement - 630/ 587-0470 (Plans Available Wednesday 6/20/07) |
| Plan Holders List - 630/ 587-0470 |
| Bid Results -Brother Asphalt - $553,030 |
City of Des Plaines - 195 West Oakton Street Storm Water Pumping Station Rehabilitation
Project Description: The City of Des Plaines is seeking bids for rehabilitation of a stormwater pump station.
- Partial Demolition of existing pump station and adjacent structures
- Removal of existing stormwater pump, electrical, controls and appurtenances.
- Replace existing storm structure flat lids including frames
- Reconstruct existing inlet/outlet including new flared end sections, and stabilization with rock gabions and poured in place concrete
- Construct new pumping station including pumps, controls, etc.
- Excavate accumulated sediment from the detention pond and re-grade
- Temporary pumping shall be provided by the contractor.
|
| Project Manager: Mark Sikora, P.E. |
| Pre Bid Mtg - Mandatory - 10:00 a.m. Tuesday, July 17, 2007 |
| Bid Date - Monday, July 23, 2007 - 3:00 P.M. |
| Advertisement - 630/ 587-0470 (Plans Available Wednesday 6/20/07) |
| Plan Holders List - 630/ 587-0470 |
| Bid Results - Mosele and Associates, Inc. - $508,368.20 |
Batavia Park District - Jones Meadow Park Pedestrian/ Bike Path Improvements
| Project Description: The Batavia Park District is seeking proposals for extension and connection of bike path within a residential neighborhood. Project includes path, retaining walls, and restoration. |
| Project Manager: Mark Bushnell, P.E. |
| Pre Bid Mtg - N/A |
| Bid Date - July 10, 2007 @ 2:00 P.M. |
| Advertisement - Call Batavia Park District @ 630/ 879-5235 |
| Plan Holders List - Call Batavia Park District @ 630/ 879-5235 |
| Bid Results - Low Bidder was Evans & Sons Blacktop - $40,271 |
DeKalb Sanitary District - 2007 Sanitary Sewer Lining Project
| Project Description: The DeKalb Sanitary District is seeking proposals for cured in place sanitary sewer lining work. |
| Project Manager: Mike Holland E.I.T. |
| Pre Bid Mtg - N/A |
| Bid Date - April 11, 2007 @ 11:30 a.m. |
| Advertisement - Call 630/ 587-0470 |
| Plan Holders List - Call 630/ 587-0470 |
| Bid Results - Low Bidder was Insituform - $402,112.00 |
Batavia Park District - Tanglewood Hills Habitat Park
| Project Description: The Batavia Park District is seeking proposals for improvements to the Tanglewood Hills Park including Construction of pathways, parking, amphitheater, playground area, recreation shelter, fitness equipment, council ring fishing station, landscaping, drinking fountain and naturalized planting restoration. |
| Project Manager: Mark Bushnell, P.E. |
| Pre Bid Mtg - March 29, 2007 at 10:00 a.m. |
| Bid Date -Tuesday April 3, 2007 at 2:00 p.m. |
| Advertisement - Batavia Park District contact Jim Eby (630) 879-5235 |
| Plan Holders List - N/A |
| Bid Results - Low Bidder was Whittaker Construction & Excavating, Inc. - $699,955 |
DeKalb Sanitary District - 2007 Spot Repair Improvements
| Project Description: The DeKalb Sanitary District is seeking proposals for sanitary sewer spot repairs. |
| Project Manager: Mark Eddington, P.E. |
| Pre Bid Mtg - March 12, 2007 |
| Bid Date - March 19, 2007 |
| Advertisement - N/A |
| Plan Holders List - Call 630/ 587-0470 |
| Bid Results - Low Bidder was Elliot & Wood - $67,505.50 |
NMWRD - Lakemoor Lift Stations 3,4 & 5 Rehabilitation
| Project Description: The Northern Moraine Wastewater Reclamation District is seeking proposals for the rehabilitation of three small lift stations in Lakemoor Illinois. The scope of work generally includes replacement of pumps, piping and controls |
| Project Manager: Mark Sikora, P.E. |
| Pre Bid Mtg -2:00 P.M. on 03/12/2007 |
| Bid Date - 2:00 p.m. on 03/19/2007. |
| Advertisement - N/a |
| Plan Holders List - Call 630/ 587-0470 |
| Bid Results - Low Bidder was Marc Kresmery Construction - $315,267.00 |
|